Stud framing was installed between steel columns and wood posts.

Reclaimed wood trims were installed on top and under the stud framing. Ceder claddings fitted between top and bottom trims.  

Spacing between claddings.

Aligning nails.

By rotating claddings, the exterior solid/void pattern reflects the facade of the adjacent landmark building.

Aluminum framing was installed for vertical polycarbonate sheets.

Every vertical panel was sanded to assure the privacy of lockrooms.

Finished interior wall.